Infrastructure integrator
Project 13 is an Institution of Civil Engineers (ICE) - led initiative to boost certainty and productivity in the delivery of infrastructure, to improve whole-life outcomes and to support a more sustainable, innovative, highly-skilled industry. It is a response to a general perception that the infrastructure sector’s current operating model is broken, with projects delivered over budget, over time and below par.
Project 13 proposes an 'enterprise model' rather than a traditional construction programme model in which:
- The owner is central and leads the enterprise, defining long-term value.
- Suppliers and advisors have direct relationships with the owner.
- An ‘integrator’ actively engages and integrates all tiers of the market.
- The key suppliers, owner, advisor and integrator work as one team to optimise value.
Project 13 defines an infrastructure 'integrator' as:
| The organisation that plans and delivers the infrastructure programme. It manages the suppliers and advisors, coordinates planning, oversees design, construction, maintenance and operations as requested by the owner. This could be made up of a single company, or a collective performing the integrator function. |
It suggests that the responsibilities of the ‘integrator’ are to:
- Understand the value defined by the investors and the owners and the outcomes required from the programme.
- Respond to the definition of value and constraints by integrating services, engineering, supply, production and manufacturing.
- Provide the management capability and system to enable the enterprise to operate as an integrated organisation.
- To put in place systems, processes and capability to drive productivity.
- Own systems integration.
- During the delivery phase integrate; engineering and planning, supply of components and resources and production on site.
- Encourage and promote innovation into the enterprise.
- Build high-performing teams.
- Establish the procurement strategy and incentivised commercial agreements.
- Manage performance of advisors and suppliers.
Ref: P13 Blueprint, Institution of Civil Engineers, May 2018.
See also: Integrator.
[edit] Related articles on Designing Buildings
Featured articles and news
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.





















